Example item schedule
Room, category, item, specification, quote basis, check point, packing note, and approval status.
Open fileSample files
These example files show a simple item schedule, inspection and packing checklist, and installation handover note.
Example files
Buyers, suppliers, forwarders, and installers all need something they can check. These files show the kind of records we try to keep during a mixed furniture and building-material order.
Room, category, item, specification, quote basis, check point, packing note, and approval status.
Open fileA checkpoint list before final payment, packing, and container loading.
Open fileRoom tags, loading sequence, missing-item log, and local installer handover reminders.
Open fileA structured version of the example records.
Open fileThese files are only examples of format. Every real project needs its own item schedule, drawings, quantities, destination checks, and service scope.
Item schedule sample
Example data only. Real projects add supplier quote, CBM, drawing version, payment milestone, production photo links, and issue owner.
| Code | Room | Category | Item | Specification | Qty | Quote basis | QC point | Packing note | Status |
|---|---|---|---|---|---|---|---|---|---|
| FB-001 | Living room | Loose furniture | Modular sofa set | 3.2 m fabric sofa, walnut side table, approved warm grey fabric | 1 set | EXW Foshan, sample fabric approved before deposit | Fabric color, frame, cushion density, leg finish | Carton plus corner protection, room label LIVING-01 | Sample finish approved |
| FB-002 | Kitchen | Cabinetry | Kitchen cabinets | L-shaped kitchen, plywood carcass, matte lacquer doors, Blum-equivalent hardware | 1 package | Shop drawing required, hardware list separated | Carcass thickness, door finish, hinge model, pre-assembly photos | Flat-pack crates, cabinet code label by elevation | Drawing revision pending |
| FB-003 | Bathrooms | Sanitary ware | Bathroom system package | 3 bathroom vanities, basins, toilets, shower screens, taps, drains, accessories | 3 sets | Accessory list and spare parts confirmed by set | Ceramic surface, faucet finish, glass size, drain compatibility | Fragile labels, foam protection, set label BATH-01 to BATH-03 | Quote basis confirmed |
| FB-004 | Facade | Doors and windows | Aluminium window package | Powder-coated aluminium frames, double glazing, insect screens where required | 100 sqm | Glass specification and target market compliance to be checked locally | Frame profile, glass label, hardware, opening direction, drainage holes | Wooden crate, elevation label, installation note attached | Compliance questions open |
The common failure is not a lack of suppliers. It is no unified schedule, no approval record, no packing evidence, and no handover note for the local installer.
We will tell you what is missing and what the next buying step should be.