Project scope

This is a main China sourcing package, not a full local renovation contract. The model fits a two-storey 200 sqm home with two living areas, a kitchen, 3-4 bathrooms, doors and windows, cabinets, loose furniture, lighting, and soft furnishings.

Important exclusions

The model does not include kitchen appliances, laundry equipment, switches and sockets, HVAC or fresh air systems, local construction labour, or local site works. Logistics, customs, taxes, door delivery, and installation are confirmed by destination country and project site.

Main budget result

A realistic planning range is about RMB 1.16-1.26 million for the product package, about RMB 1.33-1.45 million for product plus sourcing service and basic logistics, about RMB 1.5-1.7 million for DDP door delivery, and about RMB 1.8-2.1 million when installation coordination and project management reserve are included.

How to read RMB 2 million

RMB 2 million is high if it means product price only. It can be reasonable if the scope means main China procurement plus logistics, customs, tax, door delivery, local installation coordination, professional project manager tracking, optional on-site installation guidance, loss allowance, and risk reserve.

Three public package levels

RMB 780K

Essential Series

Approx. RMB 3,900/sqm. A practical base package for core furniture, selected materials, lighting, and soft furnishing needs.

RMB 1.03M

Signature Series

Approx. RMB 5,100/sqm. The recommended middle package for better finishes, fuller category coverage, and stronger design consistency.

RMB 1.54M

Prestige Series

Approx. RMB 7,700/sqm. A higher-spec package for villa, show home, hospitality, or premium residential projects.

RMB 1.8-2.1M

Full-scope project budget

When logistics, customs, tax, door delivery, local installation coordination, project management, and reserve are included.

RMB 2 million can be reasonable only as a full-scope project budget, not as a pure product procurement price.

Quick budget split by category

Category Reference scope Budget anchor
Doors and windowsAbout 100 sqmAround RMB 200K
Flooring or tilesAbout 300 sqmAround RMB 60K
Interior doorsAbout 20 setsAround RMB 40K
Bathroom systems3-4 setsRMB 20K-40K
Entrance or courtyard door1 packageAround RMB 40K
Loose furnitureWhole-home packageRMB 200K-300K
Custom cabinetsWhole-home joineryAround RMB 400K
LightingWhole-home packageAround RMB 100K
Rugs, curtains, decor, beddingSoft furnishing packageAround RMB 100K

CBM and container estimate

For a 200 sqm main sourcing package, a first CBM estimate can be 120-180 CBM. If the furniture share is high and packing is loose, it may approach 200 CBM. A 40HQ container usually loads about 60-68 CBM in practical terms, so many projects need 2-3 x 40HQ. For 140-180 CBM, 3 x 40HQ is usually safer.

Australia logistics reference

For Australia's east coast, 140-180 CBM is usually planned more safely as 3 x 40HQ. China to Australia's east coast, logistics, customs clearance, and door delivery excluding GST and installation may be roughly RMB 150K-200K. If DDP including tax and door delivery is required, logistics plus tax can need RMB 250K-320K reserved.

Market fit

Dubai - Strongest fit

High residential budgets and high local fit-out costs make whole-home China sourcing attractive.

United States - Good for premium projects

Strong value in high-end projects, but tariffs, compliance, and local installation risk need control.

Europe and UK - Selective fit

Western Europe, Northern Europe, and the UK can work well; lower-cost European regions need more careful positioning.

Australia - Competitive with compliance checks

Works well when windows, glass, board materials, certification, and installation compliance are reviewed early.

Malaysia - Only for premium clients

Price advantage is weaker; position around premium customization and one-stop coordination, not cheap sourcing.

Best-fit buyers

  • Overseas premium homeowners
  • Builders and developers
  • Villa, show home, hotel, serviced apartment, and hospitality projects
  • Buyers who want to source from China but lack supplier, QC, logistics, and project management capacity

How to position this publicly

Avoid saying low, middle, and high configuration, and avoid leading with cheap pricing. A better message is: different levels of one-stop China sourcing packages are planned around the buyer's budget, design standard, and project positioning.

Before you pay a deposit

  • Confirm the exact product and material specification.
  • Confirm quote basis and what is not included.
  • Confirm sample, production photo, inspection, and packing photo checkpoints.
  • Confirm shipping route and who owns each handoff risk.